News

PVC Industrial Products Protects History at the Pyramids of Giza

PVC Industrial Products reach as far as Egypt and as far back as 2500 years B.C. with its latest project supporting a local contractor in securing the Great Pyramids of Giza for generations to come.  Earthquake damage in 1992 causes significant damage and a partial collapse of a burial chamber, so CINTEC of Ottawa was contracted to use their patented anchoring and reinforcement systems to stabilize the ceilings without reducing the aesthetic appeal of the historic site.  CINTEC counts on PVC Industrial Products excellent product selection and detail-oriented customer service to ensure it is fully supported with industrial tubing products so that it can focus on the larger Engineering challenges.  This local business relationship goes back decades to the mid 1990’s and now effectively reaches across continents and millennia alike.

 

 

Leave a Reply